- Product Description :
- Plant capacity - 100 TON / DAY
- 26 days operation.
- 1 day working hr = 24 hrs
- 100 T /day (appr) process on basis of 3 nos. Rotary Furnaces.
- Product- Refined lead ingot.
- Raw material- Lead concentrate from pulverize Galena.
- Fuel consumption – 135 kg/hr.(max) @8700 Kcal/kg.